Civil Rate Analysis - Construction Cost Estimation is an
application that can be used to estimate the cost of construction
of different civil engineering works such as overall house building
cost and cost estimation based on particular category of
construction.
The categories supported within this app are listed below:
1. Site Clearance
2. Excavation
3. Brick Works
4. Stone Works
5. Concrete Works
6. Roofing
7. Plastering
8. Painting
9. Sanitary Works
This app is best suitable for Engineers Contractors Students and people who want to have general idea on estimating budgets for construction works.
The overall building estimation section in this app produces the result based on thumb rule and is for having general idea on cost of building a house. Specific materials’ price is taken as wholesome average from the market.
Features:
*Unit selection option - User can select either meter or feet as their default input unit.
*Currency Selection - You can select among NPR INR and USD as you default currency.(PS: Only NPR currency selection provides default data)
*Material Quantity Display - You can view the total amount material required for the construction of selected category based on you input.
*Material Price Display - You can view the total cost of each material required for the construction of selected category based on you input.
*Total Estimated Overall Cost
Disclaimer:
The default data provided are near to the national average of Nepal for the fiscal year 2076/77 B.S. The values of cost estimation may not line-up with the current market values due to various reasons like local inflation variation in transportation and fuel charges labor cost time of the year etc. However to address this issue the rate of material and manpower costing can be customized.
The categories supported within this app are listed below:
1. Site Clearance
2. Excavation
3. Brick Works
4. Stone Works
5. Concrete Works
6. Roofing
7. Plastering
8. Painting
9. Sanitary Works
This app is best suitable for Engineers Contractors Students and people who want to have general idea on estimating budgets for construction works.
The overall building estimation section in this app produces the result based on thumb rule and is for having general idea on cost of building a house. Specific materials’ price is taken as wholesome average from the market.
Features:
*Unit selection option - User can select either meter or feet as their default input unit.
*Currency Selection - You can select among NPR INR and USD as you default currency.(PS: Only NPR currency selection provides default data)
*Material Quantity Display - You can view the total amount material required for the construction of selected category based on you input.
*Material Price Display - You can view the total cost of each material required for the construction of selected category based on you input.
*Total Estimated Overall Cost
Disclaimer:
The default data provided are near to the national average of Nepal for the fiscal year 2076/77 B.S. The values of cost estimation may not line-up with the current market values due to various reasons like local inflation variation in transportation and fuel charges labor cost time of the year etc. However to address this issue the rate of material and manpower costing can be customized.
Show More >